The new San Siro stadium
Where the Generali Stadium, the new stadium of AC Milan and Inter, will be built, what will remain of the Meazza and how the area will change: the project map, answers to the most common questions and the latest news.
The project map
Tap or hover over the elements for details. The shape and position of the new stadium are approximate.
The Generali Stadium at a glance
- Who is building it: AC Milan and FC Internazionale, owners of the site since 2025.
- Who designed it: Foster + Partners and MANICA. The design was unveiled on 29 October 2026 at the Castello Sforzesco.
- Capacity: 71,500 seats on two tiers. Each end stand holds 11,700 fans, raked at up to 37 degrees.
- Size: 270 metres long (300 including the podium), about 60 metres high.
- Name: Generali Stadium, under a naming deal with Generali (€650 million over 25 years).
- Expected opening: 2031/32 season.
The stadium sits on a large podium with shops and restaurants open every day. The façade is a dense sequence of large concrete X shapes inspired by the spires of Milan Cathedral, with diamond-shaped entrances and LED lights in the colours of the home team. The fixed, double-curved roof covers every stand and carries 27,500 m² of solar panels; the pitch stays open to the sky.
Where it will be built
The new stadium will rise on the large car park west of the Meazza, between the current stadium and Via Federico Tesio, in Milan's San Siro district (Municipio 7). The two stadiums will stand side by side until the new one opens.
On the map above, the shape and position of the new stadium are approximate: the exact plan has not been published yet.
What happens to the Meazza
The Meazza opened in 1926, now holds about 75,000 spectators and will stay in use until the new stadium opens. It will then be almost entirely demolished: first the seats, then the roof built for the 1990 World Cup, and finally the stands and towers.
An L-shaped section will be kept in the south-east corner, between the blue and orange sectors, facing Piazza Axum, for new uses. How much will remain is still unclear: some reports say about a quarter of the footprint, others 9%.
How the area will change
The project area covers about 281,000 m². According to the scenarios of the strategic environmental assessment (VAS), the Meazza could be replaced by nine buildings of 5 to 17 storeys and four low-rise buildings, with 73,000–98,000 m² of offices, hotels and shops. No housing is planned.
Open space will total about 140,000 m², including 67,000 m² of green areas, and more than 80,000 m² will be handed over to the City free of charge. These are study scenarios, not the final design.
Parking and traffic
Parking will be underground, partly beneath the stadium podium; the number of spaces has not been made public. The Via Patroclo underpass will be moved and rebuilt to become the entrance to the car parks.
Local residents' groups are mostly worried about traffic: with the new stadium, events could rise from about 19 to about 80 a year.
Timeline and costs
- 2025: the City sells the Meazza and the surrounding land to AC Milan and Inter for €197 million.
- 29 October 2026: the design is unveiled.
- 2028: construction expected to start, once all permits are granted.
- 2031/32 season: first match expected, in time for UEFA Euro 2032, hosted by Italy and Turkey.
- After the opening: most of the Meazza is demolished and work begins on the rest of the area.
The whole project is worth about €2.3 billion, paid for by the two clubs.
Legal challenges and hurdles
- Five appeals by residents' groups, rejected by the regional administrative court (TAR), are now before the Council of State.
- The Court of Auditors is examining a complaint about the sale price.
- Milan prosecutors are investigating the sale.
- On 9 November 2026 the City Council asked for the environmental assessment to be suspended so that a health impact assessment can be added.
How to get to San Siro
- Metro M5 (lilac line): San Siro Stadio station, right in front of the stadium. San Siro Ippodromo and Segesta are also nearby.
- Tram 16: terminus San Siro Stadio.
The new stadium will be a few hundred metres west of the Meazza: the most convenient stop will remain San Siro Stadio on the M5.
Frequently asked questions
What will the new San Siro stadium be called?
+
Generali Stadium. The name comes from a naming-rights deal between the two clubs and Generali: €650 million over 25 years.
Where will the new stadium be built?
+
On the car park west of the Meazza, between the current stadium and Via Federico Tesio, in the San Siro district of Milan.
When will the new San Siro stadium be ready?
+
Construction is expected to start in 2028, with the first match planned for the 2031/32 season, in time for Euro 2032. The dates depend on permits and on the legal challenges still pending.
How many seats will it have?
+
71,500 seats on two tiers. Each end stand will hold 11,700 fans, raked at up to 37 degrees.
Will the Meazza be demolished?
+
Almost entirely, but only after the new stadium opens. An L-shaped section will be kept in the south-east corner, facing Piazza Axum.
Who designed the new stadium?
+
Foster + Partners (Norman Foster's practice) and MANICA (David Manica's practice), who had already worked together on the new Wembley Stadium in London.
How much does the new San Siro stadium cost?
+
The whole project, stadium and new district included, is worth about €2.3 billion, paid for by AC Milan and Inter. The City sold the stadium and land to the clubs for €197 million in 2025.
Will there be parking?
+
Yes, underground, partly beneath the stadium podium, entered from the rebuilt Via Patroclo underpass. The number of spaces has not been published yet.
Has construction started?
+
No. The project is still going through the permit process: the strategic environmental assessment is under way and appeals are pending before the Council of State. Work is expected to start in 2028.
How do I get to San Siro stadium today?
+
Take metro line M5 (lilac) to San Siro Stadio, or tram 16 to its San Siro Stadio terminus.
Latest news
Construction has not started yet: the news covers the design, permits and legal challenges. List updated automatically from Google News.
-
San Siro: a century of history, from nostalgia to billion-euro investments
Il Sole 24 ORE ·
-
Why San Siro could still survive despite AC Milan and Inter's new stadium plans after fresh twist
Football Ground Guide ·
-
Plans Unveiled For Milan’s San Siro Stadium Replacement
Forbes ·
-
Gallery of Foster + Partners and MANICA Unveil Design for New Stadium to Replace Milan's San Siro - 2
ArchDaily ·
-
Foster + Partners and MANICA Unveil Design for New Stadium to Replace Milan's San Siro
ArchDaily ·
-
'We fell behind' - what does new San Siro deal mean for AC Milan and Inter?
BBC ·
-
AC Milan and Inter confirm San Siro demolition, reveal new stadium plans
India Today ·
-
San Siro demolition: How have Milan, Inter fans reacted to Generali Stadium unveiling?
Football Ground Guide ·
-
San Siro to be DEMOLISHED as AC Milan and Inter unveil new 71,500-seater stadium
The Sun ·
-
Incredible timelapse shows how new stadium will be built right next to San Siro
The Sun ·
-
Italy: Milan and Inter unveil Generali Stadium. San Siro will be demolished
StadiumDB.com ·
-
AC Milan, Inter strike naming rights deal, new San Siro to be called Generali Stadium - The Athletic
The New York Times ·
Sources
- Domus — Generali Stadium: come sarà il nuovo San Siro di Foster e Manica
- Elle Decor — Il nuovo stadio di Milano sarà il Generali Stadium
- Panorama — Milan e Inter, ecco come sarà il Generali Stadium
- MilanoToday — VAS del nuovo stadio nell'area di San Siro
- Urbanfile — Al posto del vecchio Meazza spuntano nove palazzi